This case study showcases the HVAC upgrade of a 6,000 sqft Toronto home. Maple Air replaced two aging systems with Carrier Infinity units and added ductless zoning, resolving uneven temperatures, improving air quality, and enhancing energy efficiency throughout the home.
This case study covers the upgrade of a multistory building’s boiler system, replacing one outdated unit and adding two new NTI boilers. The project resolved heating issues for 30–40 families and improved overall system efficiency.
This case study highlights the successful installation of 9 rooftop units for Daltile in Vaughan on September 25th, 2024. With all of their RTUs over 20 years old, replacing each unit individually would have been costly. Instead, Maple Air provided a holistic solution by installing 9 new units in a single day, significantly reducing costs, improving energy efficiency, and offering long-term peace of mind.
This case study highlights the successful installation of a Mitsubishi ductless system at The Chase restaurant in downtown Toronto. The restaurant faced challenges cooling its kitchen, which experiences high heat during busy hours. Maple Air provided a unique and efficient cooling solution tailored to the needs of this commercial site.
This case study showcases the successful installation of an energy-efficient Rooftop Unit (RTU) for The Butter Chicken Factory in downtown Toronto. The restaurant faced cooling issues due to an 2 outdated RTUs, and Maple Air provided a custom solution to restore comfort for both staff and customers.
This case study details the successful installation of a Cold Climate Ductless Heat Pump system at a condominium building. The project aimed to replace an old central heat pump that was inefficient and loud, using 60-65% more electricity.